Weighing systems built to a number, not an adjective.
Eighteen engineering proposals across weighing, bagging, machine vision and line monitoring. Each one fixes the target first — mass, throughput, tolerance — then works back to the load cell, the cut-off stage and the test that proves it.
Selected proposals
Sectors
How the work is put together
- Step 01Fix the numberMass, throughput and tolerance are agreed before any hardware is named.
- Step 02Draw the chainSensor, controller, actuator, reject — every element carries the value it has to hold.
- Step 03Build and measureThe prototype is judged against the number, not against how it looks.
- Step 04Record the evidenceResults, deviations and the test that produced them stay with the drawing.
About
Most control-system projects are described in adjectives. A proposal that says “accurate and reliable” cannot be built. One that says “±0.5 % at 25 kg, 600 bags per hour, three-stage cut-off” can.
The proposals here are written the second way. The background behind them is shop-floor: transferring schematics into physical harnesses, then proving the assembly against the drawing — where tolerance, routing and traceability stop being theory.
- Discipline
- Industrial control & instrumentation
- Core
- PLC, load cells, machine vision, industrial networks
- Shop-floor
- Harness build, continuity and insulation testing
- Output
- Proposals with a measurable acceptance criterion
Bring the number that has to be met.