Lenevez Engineering Start a project

Industrial weighing · batching · bagging

Weighing systems built to a number, not an adjective.

Eighteen engineering proposals across weighing, bagging, machine vision and line monitoring. Each one fixes the target first — mass, throughput, tolerance — then works back to the load cell, the cut-off stage and the test that proves it.

03

How the work is put together

  1. Step 01Fix the numberMass, throughput and tolerance are agreed before any hardware is named.
  2. Step 02Draw the chainSensor, controller, actuator, reject — every element carries the value it has to hold.
  3. Step 03Build and measureThe prototype is judged against the number, not against how it looks.
  4. Step 04Record the evidenceResults, deviations and the test that produced them stay with the drawing.
04

About

Full background

Most control-system projects are described in adjectives. A proposal that says “accurate and reliable” cannot be built. One that says “±0.5 % at 25 kg, 600 bags per hour, three-stage cut-off” can.

The proposals here are written the second way. The background behind them is shop-floor: transferring schematics into physical harnesses, then proving the assembly against the drawing — where tolerance, routing and traceability stop being theory.

Discipline
Industrial control & instrumentation
Core
PLC, load cells, machine vision, industrial networks
Shop-floor
Harness build, continuity and insulation testing
Output
Proposals with a measurable acceptance criterion

Next step

Bring the number that has to be met.

Weight range, cycle time, accuracy. That is enough to tell you whether the approach holds.