Topic 8
Six-floor elevator controlled by PLC S7-1200 and WinCC
1. Rationale
Elevator control combines call priority, safety and SCADA. The model builds PLC skills and HMI design at once.
2. Objectives
- Cabin obeys every command
- Handle simultaneous calls
- Build the WinCC screen
3. Subject and scope
Miniature six-floor elevator (DC motor, limit switches).
4. Method
- Theory (call priority logic)
- Prototype (ladder programming)
- Evaluation (each call scenario)
5. Schedule
| Week | Work |
|---|---|
| Weeks 1-2 | Flowchart |
| Weeks 3-4 | Logic programming |
| Weeks 5-6 | Model build |
| Weeks 7-8 | WinCC design |
| Weeks 9-10 | Report |
6. Expected results
Accurate stopping; WinCC shows real-time status.